Equinor to restart Hammerfest LNG plant on Friday

Norway’s Equinor expects to restart its 4.3 mtpa Hammerfest LNG export plant on Friday following a gas leak.

Equinor said on Tuesday that the leak was detected just before 10.00am local time while personnel were moved from the area and nobody was injured.

A spokeswoman for Equinor told LNG Prime on Wednesday that the “leakage has been repaired”.

“Planned start-up is now on Friday,” she said.

The spokeswoman said it was “a leak in a valve”, adding that she can not provide further details at this point.

Gassco data showed on Tuesday that Hammerfest LNG will be offline until 1200 local time on March 26 at least due to “a gas turbine failure”.

This was later changed to “process problems” and “gas leakage in system 26”.

In May last year, Equinor closed the facility after a gas leak occurred in connection with a valve in one of the plant’s cooling circuits. The firm restarted production in June the same year.

The LNG plant liquefies natural gas coming from the Snohvit field in the Barents Sea.

Gas reaches Hammerfest LNG via a 160-kilometer gas pipeline which became operational in the autumn of 2007.

Equinor is the operator of both the Snohvit field and Hammerfest LNG with a 36.8 percent stake.

Other license owners of Snohvit are Petoro (30 percent), TotalEnergies EP Norge (18.4 percent), Neptune Energy Norge (12 percent), and Wintershall Dea Norge (2.81 percent).

The partners are currently working on upgrading the facility.

The Snohvit Future project will extend the productive life of Hammerfest LNG past 2030, and includes onshore compression and electrification of Hammerfest LNG.

Most Popular

Japan’s K Line on track with LNG fleet growth plans

According to K Line's latest financial report, the firm had 46 LNG carriers in its fleet as of the...

LNG Canada pipeline enters commercial service

Canada's TC Energy said on Tuesday CGL had executed a commercial agreement with LNG Canada and CGL customers that...

Tellurian’s unit seeks more time to build two gas pipelines

Last month, Australia's Woodside acquired all issued and outstanding Tellurian common stock for about $900 million cash, or $1.00 per...

More News Like This

Equinor says costs climb for Hammerfest LNG upgrade project

The project includes onshore compression and electrification of the Hammerfest LNG terminal. "Since the PDO (plan for development and operation)...

First LNG-powered LCO2 carrier nears delivery in China

The first of two Northern Lights JV’s LNG-powered liquefied CO2 carriers is undergoing trials in China ahead of its...

Eidesvik, Equinor to convert LNG-powered PSV to use ammonia as fuel

Norwegian energy firm Equinor has signed a contract with compatriot Eidesvik Offshore to convert the LNG dual-fuel PSV, Viking...

Eidesvik’s LNG-fueled PSV to continue work with Equinor

Norwegian shipping firm Eidesvik Offshore has secured a contract extension from compatriot energy firm Equinor for one of its...