This story requires a subscription
This includes a single user license.
RPGCL said in a tender document that the delivery windows are May 22-23, June 5-6, and June 12-13.
The firm issued the tender to the 23 organizations that have signed the MSPA (master sale and purchase agreement) with Petrobangla.
The tender will close on April 20.
Before this tender, RGPCL invited bids on April 9 for three spot LNG cargoes with deliveries during May 15-16, May 22-23, and May 25-26.
This means that RPGCL repeated the tender for the May 22-23 window.
Local media report that Bangalagesh plans to buy six spot LNG cargoes for delivery in May to fuel gas-powered power plants.
According to the reports, anticipated heatwaves are expected to boost demand for air conditioning.
Bangladesh currently imports LNG via two FSRU-based facilities, both of which feature Excelerate Energy’s FSRUs.
The 138,000-cbm FSRU Excellence serves Bangladesh’s first LNG import facility, Moheshkhali Floating LNG or MLNG, operated by Petrobangla.
Excelerate’s 138,000-cbm FSRU Summit LNG serves as the second LNG import facility operated by Summit.