Summit’s FSRU-based liquefied natural gas (LNG) import terminal in Bangladesh has completed the 300th ship-to-ship (STS) operation since its launch in 2019.
LNG Prime Annual Subscription Membership Required
You must be a LNG Prime Annual Subscription member to access this content.
GasLog Partners, part of Greek LNG carrier owner GasLog, will redeliver the 2013-built LNG carrier GasLog Shanghai, damaged in an incident in the Strait of Hormuz in August, to its owners after the vessel completes repairs at a yard in Singapore.
South Asian LNG markets have absorbed one of the most severe supply shocks in the history of the global gas trade, as the war in the Middle East and the closure of the Strait of Hormuz cut off Qatari and UAE LNG flows to a region that had made itself critically dependent on them, according to a new report by UK-based Wood Mackenzie.
Singapore's Seatrium has secured a floating storage and regasification unit conversion contract with an option for a second contract from
US FSRU player Excelerate Energy.
Amazonica LNG has signed an engineering, procurement, and construction contract with China's Jereh to build what it says is Colombia's first onshore LNG import terminal.
Nord Gas Solutions, formerly Wartsila Gas Solutions, has secured a contract to supply a regasification system for Excelerate Energy's first FSRU conversion.