LNG carrier docks at Spain’s Sagunto terminal after Greenpeace protest

The 138,000-cbm LNG carrier Merchant has finally docked at the Enagas-operated Sagunto regasification terminal following a new protest by Greenpeace activists against fossil fuels.

On Tuesday, activists on board Greenpeace’s diesel-powered ship Esperanza and on inflatable boats blocked the entrance of the Sagunto Port in Spain, preventing the loaded LNG carrier to dock at the Enagas-operated regasification terminal.

“The peaceful protest comes as an extraordinary meeting of European energy ministers takes place in Luxembourg, where they are to discuss the impact of rising energy prices and possible solutions,” Greenpeace Europe said in a statement.

“Activists from 18 different countries blocking the port are carrying banners with the messages “Gas is sinking our future” and “No gas”, in protest of the EU’s over-reliance on fossil gas, which has led to rising energy prices,” it said.

According to Greenpeace Espana, the protest lasted about 12 hours before the Civil Guard boarded Esperanza and took control of the vessel. The captain of the ship and the vessel have been detained.

During the protest, activists also wrote “No + gas” on the hull of the LNG carrier, Greenpeace Espana said. Greenpeace activists did something similar on the LNG Croatia FSRU last week.

Prior to the arrival in Sagunto, the Merchant LNG carrier loaded a cargo at Cheniere’s Sabine Pass LNG terminal in Texas, its AIS data shows.

According to VesselsValue, the LNG tanker owned by Sinokor serves a charter with US LNG player New Fortress Energy.

Most Popular

Williams launches Transco pipeline expansions

US natural gas pipeline operator Williams has launched two fully contracted expansions of the existing Transco pipeline to meet growing domestic demand and LNG exports.

Update: Shell’s LNG Canada receives LNG cargo

Shell’s LNG Canada has received a cargo of liquefied natural gas as part of the commissioning and start-up phase.

DOE gives further boost to US LNG exports

The US Department of Energy (DOE) has removed a regulatory barrier that required liquefied natural gas (LNG) projects to start export within seven years of receiving regulatory approval.

More News Like This

Excelerate buys NFE’s Jamaica business for $1.05 billion

US FSRU player Excelerate Energy has entered into a definitive agreement with compatriot LNG player New Fortress Energy to acquire NFE’s business in Jamaica for $1.055 billion in cash.

Keel laid for Scale Gas LNG bunkering vessel in China

Chinese shipbuilder Nantong CIMC Sinopacific Offshore & Engineering has laid the keel for a liquefied natural gas (LNG) bunkering vessel it is building for Scale Gas, a unit of Spain’s Enagas.

NFE amends Puerto Rico gas supply contract

US LNG player New Fortress Energy has amended its recently extended 80 TBtu islandwide gas supply contract with the Puerto Rico Electric Power Authority.

Spain’s Sagunto LNG terminal gets 1000th cargo

Spain’s Sagunto liquefied natural gas import terminal near Valencia has received its 1000th cargo onboard Latsco's LNG carrier Hellas Athina.