Work progresses on Gasunie’s Eemshaven LNG import hub

Dutch gas grid and LNG terminal operator, Gasunie, is moving forward with the construction works at its LNG import hub in Eemshaven in order to receive the first shipment in September.

The terminal is being prepared in record time so it can welcome two floating storage and regasification units next month, according to Gasunie.

Gasunie is currently laying the connecting pipeline in the Eemshaven port, operated by Groningen Seaports, it said in an update on Wednesday.

To remind, Belgium’s Exmar and Gasunie signed a five-year charter deal for the 120 meters long FSRU S188 in March.

Following a trip from Singapore, this barge-based FSRU arrived in Rotterdam in June for modification works at the Damen yard.

In the meantime, Exmar also renamed this unit Eeemshaven LNG.

Work progresses on Gasunie’s Eemshaven LNG import hub
Image: Gasunie

Besides this FSRU, Gasunie also signed a charter deal for a larger FSRU with US LNG player New Fortress Energy. The vessel in question is the 170,000-cbm Golar Igloo.

This FSRU was on Wednesday located in Denmark, its AIS data shows.

Gasunie said in a statement earlier this month it expects the two FSRUs to arrive in Eemshaven in early September.

The firms expects first delivery of LNG through the terminal to take place as early as mid-September.

LNG giant Shell booked 4 bcm while Czech firm ČEZ took 3 bcm of the terminal’s total capacity. France’s Engie secured the remaining 1 bcm of capacity.

The Eemshaven hub is the second LNG import facility in the Netherlands after the Gate terminal in Rotterdam, which is owned by Gasunie and Vopak.

With an expansion at the Gate terminal in Rotterdam and the Eemshaven project, Dutch capacity would double from current 12 bcm to 24 bcm.

Most Popular

Atlantic and Pacific LNG rates continue to decrease

Atlantic and Pacific spot liquefied natural gas (LNG) shipping rates dropped for the second week in a row, according to Spark Commodities.

Cheniere’s Sabine Pass LNG expansion project gets OK from FERC

The US Federal Energy Regulatory Commission (FERC) has approved Cheniere’s planned Sabine Pass Stage 5 LNG expansion project in Louisiana.

Hanwha Ocean and Kanata advance Canada FLNG plans

South Korea’s Hanwha Ocean has entered into a heads of agreement with Canada’s Kanata Clean Power & Climate Technologies to advance the proposed $15.7 billion floating liquefied natural gas export project in Prince Rupert, British Columbia.

More News Like This

PetroChina delivers first LNG cargo to Gate under long-term capacity deal

PetroChina International, a unit of state-owned PetroChina, has delivered its first LNG cargo to the Dutch Gate LNG import terminal in Rotterdam, owned by Gasunie and Vopak, under a long-term capacity deal.

Gasunie and Vopak launch fourth Gate LNG tank

Dutch partners Gasunie and Vopak have launched the fourth LNG tank at their Gate terminal in the port of Rotterdam.

CEZ says Eemshaven LNG imports same as last year

Czech utility CEZ said on Thursday that liquefied natural gas (LNG) imports via the Dutch FSRU-based Eemshaven LNG import terminal have not slowed this year despite the ongoing crisis in the Middle East.

Roof raised on German LNG tank

Dutch gas grid operator Gasunie and German energy firm RWE have completed raising the roof on the first LNG storage tank at the German government-backed onshore LNG import terminal in Brunsbüttel.