Enagas launches binding open season for El Musel LNG services

Spanish LNG terminal operator Enagas has launched a binding open season for logistics services at its El Musel liquefied natural gas terminal in Gijon.

In April, Enagas said that the non-binding open season attracted a “high level of interest” from the sector with a total of 16 bids from different operators and that the firm plans to launch the LNG terminal in July.

The LNG terminal operator said in a statement that the binding-open season began on Monday and will last until June 31.

After that, the process will end with the allocation of long-term loading, unloading, and storage services at the El Musel LNG terminal.

According to Enagas, the facility could contribute up to 8 bcm of LNG capacity per year to Europe’s security of energy supply.

It will allow the berthing of vessels with a capacity of between 50,000 cbm and 266,000 cbm.

Also, the LNG terminal has two tanks each with a capacity of 150,000 cbm and two tanker loading bays with a capacity to load a maximum of 9 GWh/d, and a maximum emission capacity of 800,000 Nm3/h.

Earlier this year, Enagas also entered into a deal to sell a 25 percent stake in the LNG terminal to compatriot Reganosa for 95 million euros ($101.7 million).

- Advertisements -

Most Popular

Sempra updates on Port Arthur LNG work

US LNG exporter Sempra and compatriot engineering and construction firm Bechtel are moving forward with construction on the first...

Deutsche ReGas: FSRU leaves Lubmin to start Mukran job

The 2009-built 145,000-cbm, FSRU Neptune, has left Germany's industrial port of Lubmin and is expected to arrive in Mukran...

Chevron working to resume full Gorgon LNG production after ‘mechanical fault’

Chevron Australia, a unit of US energy giant Chevron, is working to resume full production from its Gorgon LNG...

More News Like This

Wartsila scores contract for Spanish LNG bunkering vessel

A unit of Finland’s Wartsila has secured a contract to supply a cargo handling system for a new LNG...

Spain’s Enagas reports higher profit in Q1

Spanish LNG terminal operator Enagas reported a rise in its profit in the first quarter of this year, while...

Spain’s El Musel LNG terminal in first reloading op

Spanish power group Endesa will this week complete the first reloading operation at the Enagas-owned El Musel LNG terminal...

Spanish LNG imports, reloads dip in March

Spanish liquefied natural gas (LNG) imports and reloads decreased in March compared to the same month last year. Russia...