KN: four firms book capacity at Lithuanian FSRU

Lithuania’s KN said that four firms have won capacity rights at the 170,000-cbm FSRU Independence in Klaipeda after the completion of the 2024 capacity allocation procedure.

KN said in a statement that the LNG terminal’s 6 terawatt-hour (TWh) regasification capacity for the 2024 gas year has been allocated to four customers from Lithuania and Estonia.

In 2024, KN expects that the FSRU will receive 34 conventional LNG cargoes during the period and regasify a total of about 34 TWh of natural gas.

Customers from Lithuania, Latvia, and Poland, which booked long-term LNG terminal capacity last year, will receive most of the natural gas, or 24 TWh, KN said.

Poland’s PGNiG and Latvia’s Latvenergo previously each secured 6 TWh of regasification capacity for a period of ten years at the FSRU-based facility.

KN plans to allocate a further 4 TWh of capacity from the spot market over the next year, based on the need to import natural gas to ensure the isolated operation of the electricity system and, in the absence of such a need, to meet natural gas demand on a case by case basis.

Six firms to use Klaipeda LNG terminal

“The global natural gas market is still full of uncertainties, therefore it is of utmost importance that in such turbulent times Klaipeda LNG terminal operates smoothly and almost at maximum capacity, and KN fully ensures the provision of regasification services in line with the needs of the regional market,” Mindaugas Navikas, chief commercial officer of KN, said.

Navikas said that a total of 6 customers will use the LNG terminal services next year.

He said that the capacity allocation model, which the firm updated in 2022, has contributed to the stability in the use of the LNG terminal.

This model allows the terminal users to “plan their cargo deliveries accurately, thus ensuring a reliable natural gas supply at the most competitive price on the market for the customers in Lithuania and the surrounding countries,” Navikas said.

40 LNG carriers planned for this year

From the beginning of the year until July 23, the FSRU-based LNG terminal has received 20 large LNG carriers, and KN expects the same number of LNG carriers to arrive by the end of the year.

During this period, the terminal received 2.9 million cubic meters of LNG, with the majority, or 48 percent, coming from Norway.

In 2023, the FSRU also received shipments from the USA, Nigeria, and Algeria.

KN expects that the terminal will regasify about 37 TWh of natural gas this year.

By comparison, in 2022, 46 LNG carriers brought in almost 5 million cubic meters of LNG, with the majority, or 65 percent, coming from the USA.

Last year, the LNG terminal regasified a total of 32.1 TWh of natural gas.

Most Popular

ExxonMobil in Oman LNG move

US energy giant ExxonMobil has signed an agreement with Energy Oman to develop the Greater Makarem Field (Block 20) through an integrated liquefied natural gas (LNG) project.

Vitol’s unit plans to start construction on South African LNG-to-power project in late 2028

Vitol's unit Engen plans to start construction on an integrated LNG-to-power project in Durban, South Africa, in late 2028.

Argentina approves RIGI investment scheme for YPF’s LNG project

Argentina has approved the inclusion of the YPF-led Argentina LNG project in the country's ‌RIGI investment incentive regime, according to Energy Minister Luis Caputo.

More News Like This

Open season launched for Italian small-scale LNG facility

Italy's GNL Med, a joint venture between Quiris Holding Industriale and Sofipa, has launched an open season for a planned small-scale LNG and bio-LNG coastal facility in the port of Vado Ligure in northwestern Italy.

Lithuania’s KN reports higher LNG revenue

Lithuania’s KN Energies, the state-owned operator of the country’s first FSRU-based LNG import facility in Klaipeda, reported higher LNG revenue in the first half of this year due to high terminal utilization and increased regasification and reloading volumes.

Lithuania’s KN in Vietnam LNG move

Lithuania’s KN Energies, the state-owned operator of the FSRU-based LNG import facility in Klaipeda, has signed a memorandum of understanding with Vietnam-based Indel Petro to cooperate on energy and infrastructure projects in Vietnam.

Klaipeda LNG throughput up in H1

LNG throughput in the Lithuanian port of Klaipeda, home to the KN-Energies-operated FSRU-based LNG import facility, jumped in the first half of this year due to growing flows to Ukraine.