Gladstone LNG exports decline in December

LNG exports from the Gladstone port in Australia’s Queensland dropped 14.2 percent in December, according to Gladstone Ports Corporation.

Last month about 1.88 million tonnes of LNG left the three Gladstone terminals on Curtis Island, compared to 2.19 million tonnes in the same month in 2020, GPC’s data shows.

This equals 29 LNG cargoes and compares to 34 shipments in December 2020.

Most of these exports or 1.19 million tonnes landed in China, marking a drop when compared to 1.40 million tonnes last year.

The rest of Gladstone LNG exports in December went to South Korea, Malaysia, Japan, and Singapore, the data shows.

Gladstone LNG exports rose in November to about 2.13 million tonnes, up about 4.8 percent year-on-year, GPC said last month.

During the entire year of 2021, Curtis Island LNG plants dispatched 23.34 million tonnes or 356 cargoes of LNG, a rise of 4.3 percent compared to 2020.

Curtis Island is home to the Santos-operated GLNG plant, the ConocoPhillips-led APLNG terminal, and Shell’s QCLNG facility. These are the only LNG export facilities on Australia’s east coast.

Most Popular

Woodside issues Louisiana LNG construction update

In October 2024, Woodside acquired all issued and outstanding Tellurian common stock for about $900 million cash, or $1.00 per share....

Trump lifts pause on non-FTA LNG export approvals

Trump issued the executive order, which was widely expected, just hours after officially taking over his second four-year term...

Hoegh Evi, SEFE ink hydrogen pact

Norwegian FSRU player Hoegh Evi, previously known as Hoegh LNG, is joining forces with German gas importer Securing Energy...

More News Like This

Gladstone LNG exports climb in 2024

Curtis Island is home to the Santos-operated 7.8 mtpa GLNG plant, the ConocoPhillips-led 9 mtpa APLNG terminal, and Shell’s...

Gladstone LNG exports climb in November

Curtis Island is home to the Santos-operated GLNG plant, the ConocoPhillips-led APLNG terminal, and Shell’s QCLNG facility. These are the...

Santos: Barossa project almost 84 percent complete

Santos said in its investor update on Tuesday that the project was 83.5 percent complete as at October 31,...

Gladstone LNG exports up in October

Curtis Island is home to the Santos-operated GLNG plant, the ConocoPhillips-led APLNG terminal, and Shell’s QCLNG facility. These are the...