Kongsberg secures contract for Golar’s FLNG conversion

Norway’s Kongsberg Maritime has secured a “substantial” contract to provide an integrated package of electrical, control, safety, and propulsion systems for the Golar Mk2 floating liquefied natural gas (FLNG) project.

Kongsberg said in a statement the contract is valued at more than $25 million.

This contract will see Kongsberg technology form a “key” part of the new onboard systems for a major rebuild project in which Golar’s LNG tanker, Fuji LNG, will be lengthened by nearly 100 meters and converted to an FLNG vessel, the firm said.

Golar recently signed an EPC agreement with China’s CIMC Raffles to convert its 148,000-cbm Moss-type carrier, Fuji LNG, into an MKII FLNG with a capacity of 3.5 mtpa.

Also, Black & Veatch will supply the topside LNG process plant.

Golar said the total EPC price is $1.6 billion, but the total budget for the MK II FLNG conversion is $2.2 billion.

The Golar MK II design is an evolution of the MK I design of FLNG Hilli and FLNG Gimi.

Kongsberg’s equipment package for the Golar Mk2 FLNG features two UUC305 azimuth thrusters, electrical systems, as well as an integrated control and safety system (ICSS).

Notably, the thrusters will be equipped with a heading control system, leveraging Kongsberg’s expertise in dynamic positioning (DP) without requiring full DP capabilities for the FLNG.

The ICSS provided by Kongsberg ensures the safe and efficient operation of the FLNG unit.

Kongsberg said it integrates control of the process plant, energy management, power distribution, cargo handling, ballast control, and auxiliary systems.

Most Popular

Atlantic LNG shipping rates decrease this week

Atlantic spot LNG shipping rates dropped this week, while Pacific rates were flat compared to the week before, according to Spark Commodities.

Stabilis secures new approval for Galveston LNG project

Houston-based small-scale LNG player Stabilis Solutions has received a letter of recommendation (LOR) from the US Coast Guard for its planned Galveston liquefaction facility.

Russian LNG production up 10.7 percent in January-June

Russian liquefied natural gas (LNG) production rose 10.7 percent in the first six months of this year, according to the Russian statistics agency Rosstat.
spot_img

More News Like This

Axess secures Golar FLNG gig

Norway-based Axess Group has secured a contract from floating LNG player Golar LNG to carry out maintenance, build, and integrity management activities across two FLNG units.

Kosmos: nine Tortue LNG cargoes lifted in Q2

The 2.7 mtpa FLNG Gimi, which serves the BP-led Greater Tortue Ahmeyim LNG project offshore Mauritania and Senegal, continues "strong" operational performance with nine cargoes lifted in the second quarter of this year, according to US-based Kosmos Energy.

Adani Ports, Meridian score Argentina LNG gig

India's Adani Ports and Special Economic Zone (APSEZ) has secured a 10-year marine services contract from Argentina's Southern Energy for the latter's liquefied natural gas (LNG) export project, marking its entry into South America and expanding its international marine services footprint.

Chinese yard progresses Golar FLNG conversion work

China's CIMC Raffles is moving forward with converting Golar LNG's 148,000-cbm Moss-type carrier, Fuji LNG, into an MKII FLNG with a capacity of 3.5 mtpa. Following completion next year, this FLNG will be deployed in Argentina under a charter deal with SESA.