PGNiG books more regas capacity at Polish LNG terminal

Poland’s state-owned gas company PGNiG has secured additional regasification capacity at the country’s sole liquefied natural gas terminal in the port of Swinoujscie.

The company said in a statement it booked 8.3 billion cubic meters of regasification capacity at the LNG terminal from 2024 to 2040.

The Polish gas firm also booked 6.2 billion cubic meters of regasification capacity in 2022–2023 as part of a tender organized by terminal operator Polskie LNG, a unit of Gaz-System.

The two companies are yet to sign the relevant deals.

PGNiG, which is responsible for all the supplies coming to the LNG import facility, currently has about 5 billion cubic meters booked capacity up to 2022.

The company says the new regasification capacity will boost its plans to diversify gas imports and expand its trading activities on the gas market in Central and Eastern Europe.

The new capacity allocation process is tied to the expansion project that will increase the current regasification capacity of the Swinoujscie LNG terminal by 50 per cent.

Poland has significantly increased LNG purchases via its terminal in Swinoujscie following PGNiG deals with Qatargas and US player Cheniere.

The move is a part of reducing the country’s decades-old reliance on Russian pipeline gas but also cutting dependence on coal.

Last year, PGNiG brought 3.43 bcm of LNG into Poland, over one-fourth more than a year earlier.

The gas company received 0.98 bcm of LNG in the first quarter of this year, up 34 per cent when compared to the same period in 2019.

Additional Polish LNG developments

The Swinoujscie terminal expansion is not the only LNG import development in Poland.

There are also plans to install a floating storage regasification unit in the Gdansk Bay and a development aimed at building a small-scale facility in the coastal city.

A consortium consisting of Polish energy company Lotos Group and compatriot gas grid operator Gaz-System announced plans last week to build the small-scale facility in Gdansk.

The terminal would be the first such facility in Poland, which could help increase the use of LNG as a fuel in both maritime and road transport.

Most Popular

Monkey Island LNG selects ConocoPhillips’ liquefaction tech

Monkey Island LNG has selected ConocoPhillips’ optimized cascade process liquefaction technology for its planned 26 mtpa liquefaction and export facility in Cameron Parish, Louisiana.

Italy’s Adriatic LNG to resume full ops by mid-September

Italy’s Adriatic LNG import terminal, owned by VTTI and Snam, expects to resume full operations by the middle of this month following the completion of maintenance activities.

Gasgrid says seven Inkoo regas slots booked

Firms have booked seven regasification slots at the Inkoo FSRU-based terminal for 2026 following the completion of the annual allocation procedure, according to Finland’s gas system and LNG terminal operator Gasgrid.

More News Like This

Ukraine’s Naftogaz to get another US LNG cargo from Orlen

Poland's Orlen will supply another US LNG cargo to Ukraine's Naftogaz, the fourth shipment as part of a deal signed earlier this year.

Orlen to supply another US LNG cargo to Ukraine’s Naftogaz

Poland's Orlen will supply another US liquefied natural gas (LNG) cargo to Ukraine's Naftogaz, the third shipment as part of a recently signed deal.

Orlen to supply US LNG cargo to Ukraine’s Naftogaz

Poland's Orlen will supply a US liquefied natural gas (LNG) cargo to Ukraine's Naftogaz, the second shipment as part of a recently signed deal.

Orlen to supply LNG cargo to Ukraine via Lithuanian FSRU

Poland's Orlen has signed a deal with Ukraine's Naftogaz to supply the latter with one liquefied natural gas (LNG) cargo via the FSRU-based terminal in Lithuania's Klaipeda.