Croatia’s Krk LNG terminal receives cargo from Egypt

Croatia’s FSRU-based Krk import facility has received another cargo of liquefied natural gas (LNG) from Egypt, according to shipping data.

State-owned terminal operator LNG Croatia said in a short statement on Sunday it received the 49th LNG cargo at its import facility since the launch of operations in January last year.

The 2018-built 173,400-cbm, British Achiever, is expected to depart from the 140,000-cbm FSRU on December 8.

LNG Croatia did not reveal the source of the LNG shipment but British Achiever’s AIS data provided by VesselsValue shows that the vessel previously loaded the cargo at the Eni-led Damietta terminal in Egypt.

This is the second cargo in a month to arrive from the Damietta terminal to the Croatian FSRU following the shipment by the 173,400-cbm, British Mentor.

Both of these vessels serve BP under charter deals.

BP has a contract with Segas, the operator of the Damietta LNG plant, for about 1 mtpa of LNG, GIIGNL data shows.

The Damietta plant started exporting LNG again in February last year following a deal between Egypt’s EGPC and EGAS, Italy’s Eni, and Spain’s Naturgy.

The Croatian FSRU mainly receives LNG volumes from the US. Besides Egypt, it also received shipments from Nigeria, Trinidad and Tobago, and reloads from Dunkirk, Zeebrugge, and Barcelona.

European LNG demand spiked this year as European countries look to replace Russian pipeline gas and boost energy security.

Due to high demand, Croatia decided to further increase the capacity of its FSRU-based LNG import terminal.

The capacity of the terminal will rise to 6.1 bcm and the expansion project will cost about 180 million euros ($190 million).

The bigger part of the project includes the construction of a new pipeline from Zlobin to Bosiljevo while the FSRU should get a new regasification module in 2024.

Austria and the German state of Bavaria have recently shown interest to receive natural gas supplies in the future from the facility on the northern Adriatic island of Krk.

Most Popular

BP takes FID on Ginger gas project in Trinidad and Tobago

UK-based energy giant BP has taken the final investment decision on the Ginger gas development offshore Trinidad and Tobago.

Glenfarne becomes majority owner of Alaska LNG

US energy firm Glenfarne has signed definitive agreements with state-owned Alaska Gasline Development Corporation to become the majority owner of the giant Alaska LNG export project.

Japan’s Tokyo Gas to expand LNG trading business

Japan’s city gas supplier and LNG importer, Tokyo Gas, plans to expand its liquefied natural gas trading business further, including in the US.

More News Like This

CIMC SOE completes Croatian regas module

Chinese shipbuilder Nantong CIMC Sinopacific Offshore & Engineering has completed Wartsila's regasification module that will be installed onboard the 140,000-cbm FSRU, LNG Croatia.

Croatia completes new LNG pipeline

Croatia has completed the Zlobin-Bosiljevo gas pipeline as part of the capacity expansion project of the FSRU-based LNG import facility on the island of Krk.

Croatian FSRU in new LNG truck loading milestone

State-owned LNG Croatia, the operator of the FSRU-based Krk import facility, has completed the 500th LNG reloading operation directly from the vessel to a truck.

Eni, TotalEnergies to send Cyprus gas to Egypt’s Damietta LNG export plant

Italy’s Eni and its partner France’s TotalEnergies have agreed with Cyprus and Egypt to send gas from the Cronos gas field off Cyprus to Egypt's Damietta LNG plant, liquefy it, and ship the LNG supplies to Europe.