Gate LNG volumes down in January-September

Dutch Gate terminal in the Rotterdam port saw lower LNG volumes in the January-September period when compared to the year before.

The port said in its quarterly report that total LNG throughput in the port reached 4.96 million tonnes in the first nine months of this year, down 1.8 percent when compared to the year before.

Deliveries to the Gate terminal, which is a hub for all LNG volumes in the port, dropped 5.8 percent to 4.47 million tonnes.

However, the port said outgoing LNG volumes rose 61 percent to 484,000 tonnes.

This is due to a steady rise in LNG bunkering operations in the port as the world’s fleet of LNG-powered vessels continues to rise.

The port is a strong supporter of LNG as a bunker fuel and has developed one of the world’s biggest LNG fueling chains.

Gate provides most of these LNG fuel volumes.

The terminal, a joint venture of Vopak and Gasunie, recently said it plans to invest in a further capacity expansion of 1 bcm per year, following a new deal with Germany’s Uniper.

Including the newest investment, Gate would have a total capacity of 13.5 bcm per annum in 2024.

- Advertisements -

Most Popular

Avenir orders two large LNG bunkering vessels in China

UK-based small-scale LNG player Avenir has ordered two 20,000-cbm LNG bunkering and supply vessels at China's CIMC SOE. The joint...

MOL, Gaz-System seal Gdansk FSRU charter deal

Japan's shipping giant MOL has signed a long-term FSRU charter deal with Poland’s Gaz-System for the planned LNG import...

Mitsui: no decision on Adnoc’s LNG project

Japan's trading house Mitsui & Co said nothing has been decided on an LNG project in the United Arab...

More News Like This

Rotterdam LNG throughput climbs in Q1

LNG throughput in the Dutch port of Rotterdam increased in the first quarter of this year as Europe continued...

Dutch Gate testing market interest for fourth LNG jetty

Dutch Gate LNG terminal in the port of Rotterdam is testing the market’s interest in small-scale LNG ship loading...

Dutch Gate plans maintenance in May

Dutch Gate LNG terminal in the port of Rotterdam, owned by Gasunie and Vopak, plans to conduct scheduled maintenance...

Rotterdam LNG throughput up 3.7 percent in 2023

LNG throughput in the Dutch port of Rotterdam rose 3.7 percent in 2023 as Europe continued to boost LNG...