Italy’s Piombino FSRU set to receive first cargo from Eni’s Congo LNG project

Italy’s Eni is expected to deliver soon the first liquefied natural gas cargo produced at its Tango floating LNG facility moored in Congolese waters to Italy’s Piombino FSRU-based terminal, according to shipping data.

Eni said on February 27 that it was loading the first LNG cargo in the Republic of Congo, also known as Congo-Brazzaville, and that it will deliver the shipment to Snam’s Piombino FSRU-based terminal.

The 2010-built 155,000-cbm LNG carrier, GasLog Savannah, left Pointe Noire early March and was on Wednesday located in the Alboran Sea off Spain and heading towards Italy, its AIS data provided by VesselsValue shows.

However, the LNG carrier changed course and was anchored offshore Gibraltar on Thursday. The data shows that the vessel is expected in Piombino on April 6.

GasLog Savannah appears to be partially loaded.

LNG Prime contacted Eni to comment on the arrival of the LNG carrier in Piombino but we did not receive a reply by the time this article was published.

Tango FLNG

Eni introduced the first gas in December 2023 into its Tango FLNG facility. Prior to that, the unit arrived in Congo from Dubai.

The Italian firm purchased the 144 meters long Tango FLNG from Belgium’s Exmar and it also chartered the 2002-built 138,000-cbm steam turbine LNG carrier, Excalibur, to serve as an FSU for the project.

Moreover, the floating LNG producer, delivered in 2017 by China’s Wison, has a liquefaction capacity of about 1 billion cubic meters per year of gas, or 0.6 mtpa, and a storage capacity of 16,100 cbm.

Eni said the FLNG project, situated within the Marine XII permit, will achieve a plateau gas liquefaction capacity of about 4.5 billion cubic meters per annum and will mark zero flaring from operated activities in country.

Second unit

Also, a second FLNG vessel with a capacity of about 3.5 bcm per year of gas, or 2.4 mtpa, is under construction in China and is expected to begin production in 2025.

Wison Offshore & Marine won a contract from Eni in December 2022 to build the 380 meters long FLNG. The unit will be able to store over 180,000 cubic meters of LNG.

The volumes produced from the FLNG project will be marketed by Eni, strengthening and expanding the company’s LNG portfolio.

(Article updated on March 14 to say that the vessel is now expected in Piombino on April 6.)

- Advertisements -

Most Popular

Golden Pass LNG to ramp up construction activities after Zachry deal

QatarEnergy and ExxonMobil will ramp up construction activities at the Golden Pass LNG export terminal in Texas after a...

Hudong-Zhonghua confirms TotalEnergies order for LNG bunkering vessel

China’s Hudong-Zhonghua said it had secured an order to build one 18,600-cbm LNG bunkering vessel for French energy giant...

India was top destination for US LNG cargoes in May

India was the top destination for US liquefied natural gas cargoes in May, as Asia overtook Europe as the...

More News Like This

Eni’s LNG sales down in Q2

Italian energy firm Eni said its liquefied natural gas (LNG) sales were down in the second quarter of this...

GasLog’s LNG carrier named in South Korea

Greece’s GasLog has named a new liquefied natural gas (LNG) carrier at Hanwha Ocean's yard in Geoje, South Korea. According...

Snam’s Piombino FSRU now flies Italian flag, gets new name

Snam’s 170,000-cbm FSRU located in the Italian port of Piombino is now listed in the Italian ship registry. The...

Italy’s Eni sells 10 percent stake in Saipem

Italian energy firm Eni has sold a 10 percent stake in compatriot energy services company Saipem. Eni announced the...