Shell expands LNG bunkering network with first Zeebrugge op

LNG giant Shell has expanded its global LNG bunkering network with the completion of its first operation in the port of Zeebrugge, Belgium.

According to a social media post by Shell’s head of downstream LNG, Tahir Faruqui, Shell completed the maiden operation in the port of Zeebrugge, the second-largest port in Belgium, last weekend.

During the operation, Shell supplied LNG to a pure car and truck carrier (PTPC) owned by its customer, Anji Shipping (Hong Kong), a subsidiary of Shanghai Automotive Industry Corporation, Faruqui said.

The LNG dual-fuel PCTC with a capacity of 7,600 units, SAIC Anji Sincerity, took LNG from the 5,200-cbm bunkering vessel, Green Zeebrugge.

Shell joined forces with the port of Zeebrugge and its agency Hoppe Maritime Group for this first bunkering, which expands the company’s global marine LNG fueling network to 20 locations across 12 countries, Faruqui said.

In January this year, China’s Jiangnan Shipyard delivered SAIC Anji Sincerity to compatriot SAIC Anji Logistics.

Jiangnan claims this is currently the world’s largest LNG-powered car carrier in operation.

SAIC Motor said that SAIC Anji Sincerity will transport the first batch of new vehicles of China’s brands SAIC, Dongfeng Motor, and Yutong to Europe.

As per Shell’s LNG bunkering network, the LNG giant added last year two more LNG bunkering locations in Europe, Flushing, and Antwerp.

After this, Shell also completed the first LNG bunkering operation in the Caribbean with the 18,000-cbm bunkering vessel, New Frontier 2.

Most Popular

Three dead in accident at Port Arthur LNG site

Sempra Infrastructure and Bechtel confirmed that an incident took place on Tuesday at the Port Arthur LNG construction site in Texas, resulting in three fatalities and two injuries.

Second Wilhelmshaven FSRU arrives at jetty

Germany's Wilhelmshaven now hosts two floating storage and regasification units. Excelerate’s 138,000-cbm FSRU Excelsior has docked at a new jetty, two kilometers south of the already operational Wilhelmshaven 1 terminal, to start serving the second FSRU-based terminal.

Cheniere’s Corpus Christi expansion project 82.5 percent complete

The Stage 3 expansion project at Cheniere’s Corpus Christi LNG export plant in Texas is 82.5 percent complete.

More News Like This

SAIC Anji welcomes another LNG-powered PCTC into its fleet

China’s Jiangnan Shipyard has delivered another LNG-powered pure car and truck carrier to compatriot SAIC Anji Logistics.

Venture Global launches Calcasieu Pass LNG commercial ops

US LNG exporter Venture Global LNG has launched commercial operations at its Calcasieu Pass LNG terminal in Louisiana, some 68 months from its final investment decision and 38 months after production start.

YPF expects more supermajors to join Argentina LNG project, CEO says

Argentina’s state-owned oil and gas company YPF expects more supermajors to become equity partners in the planned Argentina LNG project following a deal with Shell, according to CEO Horacio Marin.

Shell expects Q1 LNG trading results to be in line compared to previous quarter

LNG giant Shell expects trading and optimization results for its integrated gas business in the first quarter of this year to be in line compared with the fourth quarter of last year.