FueLNG’s second bunkering vessel wraps up loading op

Singapore’s FueLNG, a joint venture consisting of Shell and Sembcorp Marine’s Keppel Offshore & Marine, said that its second bunkering vessel has completed its inaugural LNG loading operation.

According to a social media post by FueLNG, the 18,000-cbm FueLNG Venosa completed the loading operation through ship-to-ship (STS) transfer from the 2019-built 174,000-cbm LNG carrier, Pan Africa, on May 30.

FueLNG did not provide any additional information regarding the operation.

South Korea’s Hyundai Mipo held the naming ceremony for FueLNG Venosa on April 21 at its yard in Ulsan.

Korea Line LNG, a unit of SM Group’s Korea Line, owns this LNG bunkering vessel.

The firm ordered this vessel in April 2021 at Hyundai Mipo for about $60 million saying it would go on a charter with an Asian LNG bunkering supplier.

The contract includes a firm period of five years with options to expand it to ten years in total.

FueLNG's second bunkering vessel wraps up loading op
Image: FueLNG

This vessel joins Singapore’s first LNG bunkering ship FueLNG Bellina, owned by FueLNG.

The JV completed the first bunkering operation with this ship to a CMA CGM vessel in March 2021.

In June last year, Shell signed a new deal with France’s CMA CGM to bunker the latter’s LNG-powered containerships.

Under the multi-year bunkering deal, Shell will deliver LNG to CMA CGM’s 13,000-teu vessels in the port of Singapore, starting from the second half of 2023.

Both of these bunkering ships will deliver LNG under the deal.

Most Popular

Glenfarne still expects Texas LNG FID by end of this year

US energy firm Glenfarne confirmed it is targeting a final investment decision on its planned 4 mtpa Texas LNG export project in the port of Brownsville by the end of 2025 after the US FERC issued the final supplemental environmental impact statement for the project.

Equinor’s Hammerfest LNG back online after maintenance

Norwegian energy firm Equinor has resumed operations at its 4.3 mtpa Hammerfest LNG export plant following an extended maintenance shutdown, a spokesperson for Equinor told LNG Prime on Monday.

Kosmos: Tortue FLNG to hit full capacity in Q4

UK-based energy giant BP and its partners expect the 2.7 mtpa Golar FLNG Gimi, which serves the Greater Tortue Ahmeyim LNG project offshore Mauritania and Senegal, to reach its nameplate capacity in the fourth quarter of this year, according to US-based Kosmos Energy.

More News Like This

Fluor, JGC score FEED job for LNG Canada expansion

A joint venture of US engineer Fluor and Japan's JGC has been awarded the contract to update the front-end engineering and design (FEED) for a proposed Phase 2 expansion of the Shell-led LNG Canada project.

Shell CEO says LNG Canada ramp-up in line with expectations

LNG Canada's production ramp-up is "very much" in line with what Shell had expected, according to Shell CEO Wael Sawan.

Shell’s Q2 profit reaches $4.26 billion, LNG sales climb

LNG giant Shell reported a drop in adjusted earnings in the second quarter of 2025, while its LNG sales rose compared to the same quarter in 2024.

Seatrium: LNG carrier owners delaying non-essential repairs due to low charter rates

Liquefied natural gas (LNG) fleet owners are delaying non-essential repairs due to low charter rates, according to Singapore's Seatrium.