Deutsche ReGas still expects to launch Lubmin FSRU terminal in December

Deutsche ReGas said it has submitted an application to Germany’s Federal Network Agency for an exemption from regulation for its planned FSRU-based terminal in the German port of Lubmin.

The German firm led by Ingo Wagner and Stephan Knabe is seeking the exemption from tariff and network access regulation in accordance with Section 28a of the German Energy Industry Act (EnWG).

Knabe said in a statement issued last week that the Lubmin terminal would be the first privately financed FSRU-based facility in Germany.

“We do not claim taxpayers’ money or other government support. For the economic operation of the LNG terminal, it is inevitable to get an exemption from the regulation,” he said.

Deutsche ReGas confirmed in the statement it expects the Lubmin facility to start delivering about 4.5 billion cubic meters per year from December 1.

In July, the firm revealed it signed a term sheet with French energy giant TotalEnergies under which the latter would provide an FSRU for the project.

Lubmin is the exit point for the German-Russian gas pipelines Nord Stream 1 and 2.

The German firm said it could install two additional FSRUs to add more regasification capacity while its plans also include hydrogen.

Due to shallow waters at the location in Greifswalder Bodden, Deutsche ReGas plans to install a floating storage unit where LNG tankers with a capacity of up to 170,000-cbm would be able to dock.

From there, smaller vessels would transport the fuel to the FSRU, according to the firm.

Germany to become LNG importer this year

This unit Deutsche ReGas will charter from TotalEnergies is not connected to the four FSRUs RWE and Uniper chartered on behalf of the German government.

These vessels include the two units RWE chartered from Hoegh LNG, and the Dynagas-owned 174,000-cbm Transgas Force and Transgas Power that will go on charter to Uniper.

Germany currently has no regasification facilities but the country is fast-tracking LNG imports to reduce reliance on Russian gas and boost energy security.

Uniper has already started building Germany’s first FSRU-based LNG facility in Wilhelmshaven and expects to commission it this winter, while Dutch gas grid operator Gasunie said it expects the Brunsbuettel FSRU-based LNG import terminal to go online by the end of this year.

Such as the Uniper facility, the Brunsbuettel terminal will host one of the four chartered FSRUs as well. RWE will probably install one of the two FSRUs it chartered from Hoegh.

Besides these two terminals, Germany has also chosen Stade and Lubmin as the next two locations to install the chartered units.

In addition, Germany recently signed a deal with RWE, Uniper, EnBW, and VNG for the supply of liquefied natural gas to the first two FSRU-based LNG import terminals.

With this memorandum, the two planned FSRU-based facilities in Wilhelmshaven and Brunsbuettel would be fully supplied until March 2024.

Most Popular

Venture Global gets FERC OK to boost Plaquemines LNG capacity

US LNG exporter Venture Global LNG has received approval from the US FERC to boost the capacity of its Plaquemines LNG terminal in Louisiana to 27.2 mtpa.

First Rio Grande LNG tank taking shape

US LNG developer NextDecade continues to make progress on the first phase of its Rio Grande LNG export plant in Texas, including the first 180,000-cbm storage tank.

US LNG exports reach 29 cargoes

US liquefied natural gas (LNG) plants shipped 29 cargoes during the week ending February 19. According to the Energy Information Administration, pipeline deliveries to the LNG terminals increased compared to the prior week.

More News Like This

DET expects Excelerate’s FSRU to arrive in Wilhelmshaven in Q1

Excelerate’s 138,000-cbm FSRU Excelsior is expected to arrive in Wilhelmshaven by the end of March, according to state-owned German LNG terminal operator DET.

DET rejects Deutsche ReGas claims

State-owned German LNG terminal operator DET on Tuesday rejected a claim by Deutsche ReGas, the operator of the Mukran LNG terminal, that it has been marketing its regasification capacities at prices “significantly below” the cost-covering fees.

Deutsche ReGas terminates FSRU charter deal

German LNG terminal operator Deutsche ReGas has terminated the charter contract for the 174,000-cbm FSRU Energos Power with the German government.

German FSRU terminal operator allocates 2025 regas slots

In December last year, DET allocated six regasification slots for the first quarter of 2025 at its FSRU-based terminals in Brunsbüttel and Wilhelmshaven 1.