Russia’s Zvezda lays keel for third Arctic LNG 2 carrier

Russian Zvezda shipyard has held a keel-laying ceremony for the third out of fifteen ice-class Arc7 carriers that will serve Novatek’s Arctic LNG 2 export project.

The yard said in a statement it held the ceremony on December 10 for the 172,600-cbm LNG carrier Sergei Witte. Zvezda should complete this vessel in 2023.

This is the second LNG carrier in a batch of 14 vessels Sovcomflot had ordered together with independent LNG producer Novatek as part of the SMART LNG joint venture.

To remind, Zvezda held a keel-laying ceremony for the first vessel in June but Sovcomflot ordered this vessel directly at Zvezda. It held the same ceremony for the second vessel in August as well.

Russia’s Zvezda lays keel for third Arctic LNG 2 carrier
Image: Zvezda

Also, Zvezda is building all of these vessels in a partnership with South Korea’s Samsung Heavy Industries that provides technological support.

All of the LNG carriers will operate under the Russian flag and they will be 300 meters long but also 48.8 meters wide, and feature GTT’s Mark III membrane containment system.

In addition, the propulsion system includes three azimuth units with a total capacity of 45 MW.

First Arctic LNG 2 train to start ops in 2023

The construction of these LNG carriers will ensure year-round transport of LNG along the Northern Sea Route to the Asia-Pacific region.

Russia’s Zvezda lays keel for third Arctic LNG 2 carrier
Image: Zvezda

The Arctic 2 LNG project located on the Gydan peninsula includes the construction of three LNG trains with a capacity of 6.6 mtpa, each, using gravity-based structure platforms.

Novatek expects to launch the first LNG train in 2023, with trains 2 and 3 to follow in 2024 and 2025, respectively.

Besides operator Novatek, the project partners include TotalEnergies, CNPC, CNOOC, and the consortium of Mitsui and JOGMEC.

Most Popular

Golar moving forward with new FLNG order

Floating LNG player Golar LNG is moving forward with its plans to order its fourth FLNG conversion. In order to secure "attractive" delivery, Golar plans to enter into slot reservations for long-lead equipment within the third quarter of this year.

Seapeak books $19.3 million charge as it lays off seafarers on steam LNG carriers

Stonepeak’s Seapeak booked $19.3 million of restructuring charges in the second quarter of this year, primarily due to laying off its Spanish seafarers working on steam LNG carriers.

Hanwha’s units, Kospo to jointly buy US LNG

South Korea's Hanwha Aerospace and Hanwha Energy, units of Hanwha, are teaming up with compatriot Korea Southern Power (Kospo) to jointly buy US liquefied natural gas (LNG) supplies.

More News Like This

Novatek reports lower H1 profit

Russian LNG producer Novatek reported a 34 percent drop in its net profit in the first half of this year.

Russian LNG production continues to decline

Russian liquefied natural gas (LNG) production continued to decrease in June compared to last year, according to the Russian statistics agency Rosstat.

EU lifts sanctions against LNG carrier trio

The European Union has lifted sanctions against three ice-class liquefied natural gas (LNG) tankers operated by Japan's shipping giant MOL and intended to serve Novatek's Arctic LNG projects in Russia.

Novatek’s gas sales climb in Q2

Russian LNG exporter Novatek reported a rise in its natural gas sales, including LNG, in the second quarter of this year.