Gasunie plans second Dutch LNG import terminal, Gate expansion

Dutch gas grid operator Gasunie is looking to build the country’s second LNG import facility and boost capacity at the Gate terminal, as part of plans to reduce reliance on Russian gas.

The Dutch government said on Monday it was taking steps to reduce the country’s dependence on gas supplies from Russia “as soon as possible”.

In that regard, state-owned Gasunie is working with the Dutch cabinet on boosting the country’s LNG import capacity in the short term.

Gasunie said in a statement it would look into the possibility of installing a floating LNG terminal in the Eemshaven port, operated by Groningen Seaports. The facility would have a capacity of about 4 bcm.

The firm did not reveal more details about the project. It could include a floating storage and regasification unit (FSRU).

This is not the first time for the Eemshaven port to be mentioned as a potential home to a new LNG import facility.

Back in 2007, Gasunie and Vopak, the partners in the Gate terminal, joined forces with Essent to develop an onshore facility with up to 12 bcm capacity per year in the port.

However, the partners dropped these plans later in 2010.

Dutch LNG import capacity could double

Besides this floating Eemshaven terminal, Gasunie also plans to expand the capacity of the existing Gate terminal in Rotterdam by about 5-8 bcm.

Launched in September 2011, the terminal currently has an annual throughput capacity of 12 bcm of gas per year, but it will boost it to 13.5 bcm from 2024 as part of a deal with Germany’s Uniper.

With the new LNG facility in Eemshaven and the expansion of Gate, the LNG capacity in the Netherlands could double from 12 bcm to 24 bcm, Gasunie said.

Gasunie hopes to announce more details about these developments in “the near future”, the firm said.

This move follows a recent announcement regarding the Brunsbuettel LNG import terminal in Germany.

Gasunie is joining forces with the German government but also RWE to build the LNG import terminal as the country looks to reduce reliance on Russian gas as well.

Also, the Dutch firm would operate the LNG terminal and it plans to start building the plant with an annual capacity of 8 bcm this year.

Most Popular

Glencore pens Chinese LNG supply deal

Switzerland-based energy trader Glencore has signed a long-term deal to supply liquefied natural gas (LNG) to a unit of China Suntien Green Energy.

Equinor seals long-term LNG SPA with Thailand’s PTT

Norwegian energy firm Equinor has signed a long-term LNG sales and purchase agreement with a unit of Thailand’s PTT.

Atlantic LNG rates continue to increase

Atlantic spot LNG shipping rates rose for the third week in a row, rising $5,250 week-on-week to $25,250 per day, according to Spark Commodities.

More News Like This

Gasunie, Vopak plan fifth Gate LNG jetty

Dutch partners Gasunie and Vopak plan to build a fifth liquefied natural gas (LNG) jetty at their Gate terminal in the port of Rotterdam.

Gasunie: Dutch gas storage will not meet winter filling target

Dutch gas grid and LNG terminal operator Gasunie said on Wednesday that the Netherlands will not meet its previously set gas storage filling target of 115 TWh for this winter, which is about half of the country's gas consumption.

Gasunie and Vopak to launch fourth Gate LNG tank in Q3

Dutch partners Gasunie and Vopak expect to launch the fourth LNG tank at their Gate terminal in the third quarter of this year, according to Vopak CEO Dick Richelle.

Rotterdam LNG bunkering volumes rise in Q2

LNG bunkering volumes in the Dutch port of Rotterdam rose in the second quarter of this year compared to the previous year.