Norway’s Equinor gets OK to upgrade Hammerfest LNG terminal

Norway’s Equinor and its partners in the 4.3 mtpa Hammerfest LNG export plant have received an approval to upgrade the facility located on Melkoya island.

Equinor said in a statement on Tuesday that the Norwegian government has approved the Snohvit partners’ plans for the future operation of Snohvit and Hammerfest LNG, subject to certain conditions.

Also, the approval includes onshore compression from 2028, and electrification of the plant from 2030.

The Norwegian firm and its partners said in December they would invest 13.2 billion Norwegian krone ($1.3 billion) to upgrade the facility located on Melkoya island.

Hammerfest LNG liquefies natural gas coming from the Snohvit field in the Barents Sea.

Gas reaches Hammerfest LNG via a 160-kilometer gas pipeline which became operational in the autumn of 2007.

Equinor is the operator of both the Snohvit field and Hammerfest LNG with a 36.8 percent stake.

Other license owners of Snohvit are Petoro (30 percent), TotalEnergies EP Norge (18.4 percent), Neptune Energy Norge (12 percent), and Wintershall Dea Norge (2.81 percent).

Start of electrification pushed back

Compared to the partnership’s application, the authorities have postponed the start of electrification by two years, from 2028 to 2030, Equinor said.

The plant will continue to run on gas turbines during this period.

According to the firm, the approval opens for maintaining the gas turbines for back-up power from 2030 to 2033, while the need for this will be assessed by 2028 at the latest.

Equinor said that electrification of Hammerfest LNG will replace today’s gas turbines with electricity from the grid.

Moreover, this reduces CO2 emissions from the plant by around 850,000 tonnes annually, Equinor said, adding that this is the most substantial individual emission reduction decision that has been made aimed at decarbonizing oil and gas production in Norway.

“The Snohvit owners are pleased that the government has now approved Snohvit Future, a project that will strengthen Norway’s position as a reliable, long-term supplier of gas produced with very low greenhouse gas emissions,” Geir Tungesvik, Equinor’s executive vice president for projects, drilling, and procurement said in the statement.

“The project ensures long-term operation and export from Melkoya towards 2050. We fully understand that there have been many factors to consider, and we will recommend the partnership to meet the conditions for the authorities’ approval,” he said.

Most Popular

Posco International, Glenfarne ink Alaska LNG pact

US energy firm Glenfarne and Posco International, a unit of South Korean steel producer Posco, have signed a deal to advance a strategic partnership for the development of the Alaska LNG project. This includes initial terms for a long-term heads of agreement for LNG supply.

Monkey Island LNG pens offtake MoU

Houston-based Monkey Island LNG, the developer of a 26 mtpa liquefaction and export facility in Cameron Parish, Louisiana, said it had signed a memorandum of understanding with an unidentified international oil company for the offtake of LNG.

Hudong-Zhonghua gets approvals for new LNG bunkering vessel

Chinese shipbuilder Hudong-Zhonghua has received approvals from five classification societies for a 25,000-cbm LNG bunkering vessel design it jointly developed with French LNG containment specialist GTT.

More News Like This

Cheniere clinches Botas LNG supply deal

Turkiye’s state-owned natural gas and LNG firm Botas has signed a deal to buy liquefied natural gas from US LNG exporting giant Cheniere. Botas also signed deals with SEFE, Equinor, and jera.

Equinor eyes LNG carrier order

Norwegian energy firm Equinor is interested in booking liquefied natural gas (LNG) carriers at yards in South Korea and China, according to shipbuilding sources.

Deutsche ReGas: BASF, Equinor book Mukran regas capacity

German chemicals giant BASF and Norwegian energy firm Equinor have booked long-term regasification capacity at the Deutsche ReGas-operated FSRU-based LNG import facility in Mukran, Germany.

Equinor resumes Hammerfest LNG ops

Norway’s Equinor has restarted its 4.3 mtpa Hammerfest LNG export plant following an unplanned shutdown over the weekend.