Germany inks LNG supply deal for two FSRU terminals

Germany has signed a memorandum of understanding with RWE, Uniper, EnBW, and VNG for the supply of liquefied natural gas to two FSRU-based LNG import terminals.

German Economy and Climate Change Minister, Robert Habeck, signed the memorandum on Tuesday with officials from the energy firms.

With this memorandum, the two planned FSRU-based facilities in Wilhelmshaven and Brunsbuettel would be fully supplied until March 2024, Habeck said after the signing of the memorandum.

According to a statement by the German economy ministry, the parties will now work to finalize the legally binding contracts for the two terminals which will have a capacity of up to 12.5 bcm per year.

Germany is moving quickly with its plans to build infrastructure and become a major LNG importer, and has introduced the LNG acceleration law and chartered four FSRUs.

These vessels include the two units RWE chartered from Hoegh LNG, and the Dynagas-owned 174,000-cbm Transgas Force and Transgas Power that will go on charter to Uniper.

Uniper has already started building Germany’s first FSRU-based LNG facility in Wilhelmshaven and expects to commission it this winter, while Dutch gas grid operator Gasunie said it expects the Brunsbuettel FSRU-based LNG import terminal to go online by the end of this year.

Such as the Uniper facility, the Brunsbuettel terminal will host one of the four chartered FSRUs as well. RWE will probably install one of the two FSRUs it chartered from Hoegh.

Uniper and RWE will operate these facilities until a special purpose vehicle takes over the operation, according to the ministry.

Besides these two terminals, Germany has also chosen Stade and Lubmin as the next two locations to install the chartered units.

Deutsche ReGas, which is developing an LNG import terminal at the German port of Lubmin, also recently signed a term sheet with French energy giant TotalEnergies under which the latter would provide an FSRU for the project.

Most Popular

Venture Global’s Plaquemines LNG terminal achieves first production

Venture Global announced on Friday it had reached first LNG production at the company’s second facility, Plaquemines LNG, in...

Spot LNG rates remain weak

“Spark30S rates rose for a fourth consecutive week, increasing marginally by $750 to $23,500 per day,” Qasim Afghan, Spark’s commercial...

Swan Energy, Nebula’s AG&P LNG plan Indian JV

Swan Energy said on Friday it had signed a heads of agreement with AG&P Terminals &Logistics (Singapore). The two firms...

More News Like This

Germany’s DET offers short-term regas capacity at two LNG terminals

DET announced on Thursday the marketing of short-term regasification capacities at its FSRU-based LNG terminals in Brunsbüttel and Wilhelmshaven...

UAE’s Adnoc, Germany’s EnBW finalize LNG supply deal

EnBW said on Monday the SPA converts the previous heads of agreement between the two firms into a definitive...

German FSRU terminal boosts sendout in 2024

The 170,000-cbm FSRU Hoegh Gannet, which serves the Elbehafen LNG import terminal Brunsbüttel, started supplying regasified LNG to the German grid...

Burckhardt secures German LNG terminal gig

German LNG Terminal, a joint venture which includes Dutch gas grid operator Gasunie and German energy firm RWE selected...